Design and implementation of new production facilities and change of the mining technology

Maronas Ltd. has successfully completed the design and implementation of new production facilities and change of the mining technology in the “Vrachanski varovik” deposit. – assigned by Sadas. Ltd. We developed a mixed system using diamond wire cutters and a chainsaw machine. For this purpose, a Fantini 50.81 RATC / P chainsaw was chosen and delivered with a useful cutting length of 3.4m. The new system has achieved an increase in the speed of construction of excavation developments (inclined and horizontal trenches) and a more efficient utilization of the useful volumes in their range.